The Watershed Protection Branch has provided technical guidance
documents online organized under these categories:
| Regulated Facility Group |
Contact Person |
Contact Phone |
| Drinking Water
|
Brad Addison |
404.656.4807 |
| Engineering and
Technical Support (Wastewater) |
Bob Scott |
404.675.6233 |
|
|
Urban Water Reuse
Curtis Boswell
|
404.675.1602
|
| Erosion and Sedimentation
Dirt 2 (Erosion and Sedimentation Control Technical Study Committee)
|
Georgia Soil and Water Conservation Commission
Jan Sammons
Tom Sills
Chattahoochee-Flint Regional Development Center
|
706.542.3065
404.675.6240
706.675.6721
770.854.6026 (from Atlanta)
|
|
Environmentally Sensitive Property
|
Bill Smith |
404.656.3214 |
| Field Investigation Quality Assurance (Water Quality)
|
Mike Phipps
Linda Harn |
404.675.6236 |
| Flood Plain Management
Georgia Floodplain Management Office recommends these three applicable model Flood Damage Prevention Ordinances for communities participating in the National Flood Insurance Program (NFIP). Each ordinance complies with FEMA's floodplain management regulations as described in 44 Code of Federal Regulations (CFR), Section 60.3.
Other Floodplain Management Information
- Floodplain Management Manual: a reference manual for local
officials, floodplain administrators, and persons involved in floodplain
determinations, enforcement and reviews. This document is being revised
and is currently unavailable.
- Flood Insurance Rate Maps, Flood Hazard Boundary Maps, and Flood
Insurance Studies: Contact the Georgia Floodplain Management Office.
- Offsite Links
|
Collis Brown |
404.656.6382 |
GEFA Implementation Unit
Metropolitan North Georgia Water Planning District
Wastewater Plant Operations
Commercial Waste Rules
|
Coordinator/Commercial Waste Rules
Ernest U. Earn
Metro District
Emily Wingo
Wastewater Manuals
Bob King |
404.675.6233
|
| Geographic Information Systems
|
Alan Sandercock |
404.657.6135 |
| Geologic Technical Investigations
|
[Vacant]
|
404.656.3214 |
| Land Activity Management
|
Michelle Vincent |
404.675.6240 |
| Long-Term BOD Test References
|
Paul Lamarre |
404.657.6236 |
Macroinvertebrate Bioassessment SOP
|
Kathy Methier |
404.675.6236 |
| Storm Water
General NPDES Permits for Storm Water Discharges From Construction Activities (GAR100001, GAR100002, and GAR100003) and Other Infomation [August 2008] *updated*
- Industrial Storm Water
The 2006 - 2011 NPDES General Permit No. GAR000000 for Storm Water Discharges Associated with Industrial Activity was reissued on June 16, 2006. The permit was effective on August 1, 2006. Coverage under the new permit can only be obtained by submitting the NOI - Version 2006. New facilities are required to submit their NOI at least one (1) week prior to the commencement of the industrial activity at the facility. Existing facilities will have up to thirty (30) days after the effective date to submit the NOI. NOTE: Facilities sampling under Part III. C of the permit and facilities subject to a numeric effluent limitation in Part V of the permit must submit the Annual Report no later than December 31, 2007 (and on an annual basis threafter). All other facilities must submit the Annual Report no later than October 31, 2008 (and on an annual basis thereafter).
- Phase II Municipal Stormwater
- Phase I Municipal Stormwater
|
Construction Stormwater:
Jan Sammons
Industrial Stormwater:
Mark Wyland
EPD Small Business Environmental Assistance Program for Industrial Stormwater
Chip Scroggs
404.362.2659
Phase II Municipal Stormwater:
Lyn Mickelson
Lisa Perrett
|
404.675.6240 for all stormwater contacts
|
| Total Maximum Daily Loadings
|
Elizabeth Booth |
404.675.1675 |
| Underground Injection Control
|
Bill Smith |
404.656.3214 |
| Wastewater (NPDES & LAS)
- Offsite Link (Animal Feeding Operation Permitting Information
and Forms)
|
Jane Hendricks |
404.362.2680 |
| Water Well Driller Standards
|
Bill Smith |
404.656.3214 |
| Water Withdrawal Permitting
|
Bill Frechette |
404.675.1680 |
| Watershed Assessment and Protection Plan Guidance Documents
Phase I
Phase II
Phase III
Watershed Assessment Data Reporting Template (Excel Format) [June 2008]
The above Excel file is provided for all NPDES permit holders who are required to complete a Watershed Assessment and Watershed Protection Plan. Spreadsheet should be used to report all water quality data collected during the Watershed Assessment and subsequent Long Term Monitoring process.
Tools for Total Maximum Daily Load (TMDL) Implementation and Watershed Planning 
|
Elizabeth Booth |
404.675.1675 |
|
|
|